contact:
(404) 754-7373
rai@re-doremodeling.com

 

rethink your space

 

services

pictures
kitchens
bathrooms
decks & patios
additions

testimonials

bathrooms

click on photos to enlarge.

before. 1910 bungalow. after. Original clawfoot tub refinished and re-installed in new master bath - replaced here with deep tub. Entire bath gutted and replaced. New fixtures in 1900's style; new window in shower, waterproofed.
new. See old clawfoot tub, above -- here it is refurbished. Open, walk-in shower to right. new. Triple faucets; travertine tile with glass mosaic inset.
new. Travertine floor tile; space under dormer utilized for storage. new. Double vanity, "treehouse" view. back to top
before. after. Wall tile removed, re-drywalled; new window, toilet, modern wall-mount sink, floor & shower tile; original tub refinished (trim not installed at time of photo). back to top
before. Floor joists reinforced, cast iron plumbing removed. after. New everything; original tub refinished. Floor tile is porcelain with stone mosaic inset. back to top
new. Bathroom in new addition designed for children - deep tub, fun colors, lots of ducks. back to top